Loading market data…
Where we operate

Project locations

Explore the portfolio by country, region, project type or mineral.

Featured investment opportunity — Antioquia

Project MP-11

High-grade underground polymetallic mining operation in Antioquia — fully permitted and ready to resume production.

Ready to operate Antioquia Polymetallic — Au / Ag / Cu / Zn / Pt
$6.0M USD
Project valuation
19.0 g/t
Avg gold grade (Au)
10 years
Estimated lifespan
125 kVA
Power capacity
Low risk
ESG & permitting

1. Geology & ore potential

Deposit typeHydrothermal quartz vein system
Host rockHigh-competence gneisses
Vein thickness0.2–1.0 m (narrow vein, high-grade)
Estimated grade19.0 g/t Au (high-grade tenor)
By-productsSilver, copper, zinc, platinum

4. Underground mining method

Mining methodRoom and pillar
Drilling & blastingConventional pneumatic drilling
Internal loadingManual loading at working faces
Surface hoistingSkip transport system

2. Infrastructure & site utilities

  • On-site power capacity up to 125 kVA for plant and underground operations
  • Permitted and certified on-site explosives storage (powder magazine)
  • Fully equipped mechanical and electromechanical workshops
  • On-site accommodation for operational staff

5. Mineral processing plant

Sequential circuit optimized for maximum precious-metals recovery via gravity concentration and leaching.

Jaw crusher→ Ball mill→ Wilfley tables→ Cyanidation

3. ESG, social & environmental guarantees

  • No prior consultation required — unencumbered by ethnic or indigenous prior consultation processes
  • Located entirely outside protected natural areas or ecological reserves
  • Stable social environment with zero public order issues

6. Investment thesis & key drivers

  • Project valued at $6.0 million USD
  • Immediate cash flow — fully developed asset ready to resume extraction and processing
  • 19 g/t Au grade provides robust downside protection against price volatility
  • De-risked asset: zero socio-environmental hurdles and zero security risks accelerate ROI

Interested in Project MP-11?

Request the full executive investor summary and technical documentation.

Investor inquiries
Featured investment opportunity — Antioquia

Project PM-01

Polymetallic gold-silver asset in Antioquia — approved permits, an existing 60 tpd processing plant, and large-scale historical gold resources.

Ready to operate Antioquia Gold & Silver — Au / Ag
~9.0M oz Au
Estimated resources
857.9 Ha
Title area
Approved
Work plan (PTO)
Global / EMP
Environmental license

1. Identification & legal status

Project codePM-01
Legal statusActive, registered with Colombia's National Mining Registry (RMN)
Title validityConsolidated mining title valid through 2051
Location & extentAntioquia, Colombia — 857.9 hectares
Target mineralsGold (Au) and Silver (Ag)

2. Geological potential

  • High-grade "Mother Lode"-style vein system with skarn zones
  • Historical estimate of approximately 9,000,000 oz of gold (historical estimated/proven resources)
  • Over 90 identified mineralized structures with free gold and sulfide-associated gold
  • Reference grades exceeding 100 g/t Au in fronts such as the BA-5 and LB-4 veins

3. Infrastructure & logistics

  • Processing plant with installed milling capacity of up to 60 tonnes/day
  • Ball mill, crushing circuit, Nelson gravity concentrators and a 400 kVA electrical substation
  • 27 underground mine developments (La Cuadrazón, Buenos Aires and Las Hebras tunnels)
  • 153 km from Medellín by road, near a paved airstrip

4. Environmental & social status

  • Valid Global Environmental License and Environmental Management Plan (EMP)
  • Work plan (PTO) approved by Colombia's National Mining Agency (ANM)
  • Formalized relationship with the local community through a mining cooperative in a district with a long mining tradition

5. Transaction structure & due diligence

Deal structureAcquisition of 100% of the assets (mineral rights, complete physical infrastructure and geological information)
Target valueUSD $6,000,000
Due diligenceExclusive access to a virtual data room (VDR) with detailed mapping, geological reports and financial statements upon NDA execution
Investment profile & risk mitigation

Project PM-01 is a highly de-risked asset thanks to its approved work plan and valid environmental license. It offers immediate operating infrastructure (a 60 tpd plant and 400 kVA substation) and significant scale-up potential in a world-class district.

Interested in Project PM-01?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Chocó

Project MP-07

High-grade historical prospect with existing drill data and tunnels in Chocó — early-stage investment opportunity pending permitting.

Exploration — permitting pending Chocó Entry value: USD $2.0M
$2.0M USD
Entry value
National road
Site access
Not approved
Work & construction plan (PTO)
Pending
Environmental license

1. Technical background & potential

  • Solid historical dataset: information from prior exploration work, historical tunnels and geophysics
  • Diamond drilling: earlier core-drilling campaigns support geological continuity
  • Operating precedent: a pilot plant operated successfully here in past decades
  • Lower entry risk: infrastructure from previous mining development significantly reduces initial exploration capital

2. Social & logistics viability

  • Ethnic-community agreement: an active Mutual Benefit Agreement with the area's senior ethnic authority
  • Secured social license: strong community relations for development without disruption
  • Direct connectivity: strategic link to the national road network for heavy machinery, supplies and technical staff

3. Legal & regulatory status

Environmental license: not yet obtainedThe project needs a full Environmental Impact Study (EIA) prepared and filed.
Work & Construction Plan (PTO): not approvedPending technical update and filing under current regulations.
Clean-slate permitting windowAn ideal stage to build environmental and engineering parameters in from the initial design.

4. Critical path & next technical steps

Technical validation

Audit, digitization and update of historical data to modern standards (NI 43-101 / JORC).

Deep drilling

A confirmation drilling program to verify volume and continuity at depth.

Studies & scale-up

Advanced metallurgical testwork, detailed engineering and international resource/reserve certification.

Investment opportunity & commercial structuring

Asset valued at USD $2,000,000. Open to contract-based investors for the exploration phase, as well as staged investment or joint-venture structures to fund technical validation, permitting (PTO and environmental license) and final operational scale-up.

Interested in Project MP-07?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Tolima

Project AU-21

Orogenic gold project with completed geological study and reserve calculation, concession contract in process. No public-order, Afro-descendant or Indigenous conflicts.

Formalization underwayTolimaGold (Au)
USD 2.5M
Entry value
14 g/t Au
Average grade
815.7 ha
Title area
144,296 t
Probable reserves

1. Geology & resources

Deposit typeOrogenic quartz-sulfide vein system
Regional geologyRegional metamorphic complex / intrusive batholith
Estimated grade14 g/t Au
ResourcesMeasured 92,313 t · Indicated 66,795 t · Inferred 77,501 t
PotentialExpandable zones (122 ha + 693 ha) pending exploration, potential to 250 m depth

2. Legal & environmental status

  • Special Reserve Area with concession contract in process
  • Work Plan (PTO) under evaluation; feasibility already approved
  • No public-order, Afro-descendant or Indigenous conflicts
  • Paved-road access

Interested in Project AU-21?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Bolívar

Project AU-23

Operating concession title within one of the region's most important mining districts, with several active mines and processing plants, approved PTO and environmental license.

In operationBolívarGold, Silver & Platinum
3,005.78 ha
Free area
Approved
PTO
Approved
Environmental license (EMP)
40–50 g/t
Sampled grades

1. Geology

Deposit typeStructurally controlled gold vein system
Sampled gradesTens of g/t Au-Ag across individual veins
ReservesPer-vein reserve calculation from sampling, several active mines

2. Legal & environmental status

  • Approved PTO; approved environmental license (EMP); obligations up to date
  • Community endorsement for the project's development
  • Free area of 3,005.78 ha after cessions; valid mining registry

3. Operation

  • Underground mining with several active processing plants in the area
  • Road and river access

Interested in Project AU-23?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Cesar

Project CU-24

Open-pit copper mining title in immediate operation, with a proven reserve certified before the mining authority and monthly production capacity in the thousands of tonnes.

Immediate operationCesarCopper (Cu)
6,719,984 t
Proven Cu reserve
USD 4.0M
Investment
3,000–5,000 t/mo
Estimated production
2048
Permit valid through

1. Geology & operation

Deposit typeCopper in an open-pit deposit
Operation points4 simultaneous operation points
PowerHigh-voltage power available

2. Legal & environmental status

  • Approved PTO and environmental license (EMP); valid RUCOM
  • Documents up to date; 5% performance bonds
  • Endorsement from the mining project's community

Interested in Project CU-24?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Caldas

Project AU-25

Gold title with international NI 43-101 technical studies certifying multimillion-ounce gold resources, with most of the title still pending exploration.

AvailableCaldasGold (Au)
~14.0M oz
Estimated total resource
3.5M oz
Certified reserves
716 ha
Title area
85%
Of the title pending exploration

1. Geology & resources

Deposit typeIntrusive stock with gold veins (recognized mining district)
Certified reserves (NI 43-101)3,500,000 troy oz
Inferred resources10,500,000 troy oz
Studies performedTest pits to 400 m over 15% of the title; potential at greater depth

2. Legal status

  • No legal annotations; title fully up to date
  • No public-order, Afro-descendant or Indigenous issues

Interested in Project AU-25?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Chocó

Project PM-26

Valid polymetallic project in the exploitation stage, with a formalized community agreement and exploration history dating to the 1970s, including historical tunnels and a pilot plant.

Valid — exploitationChocóPolymetallic — Au / Ag / Cu / Zn / Pb
3,293.4 ha
Title area
5 minerals
Polymetallic target
Active
Ethnic-social agreement

1. Geology

Deposit typePorphyry-type and polymetallic vein potential
Regional geologyBatholith metallogenic belt; first-order Cu-Zn-Pb-Ag geochemical anomaly

2. Background

  • Historical exploration since the 1970s (mapping, geophysics, diamond drilling)
  • Historical tunnels and a previously operated pilot plant

3. Legal & social

  • Valid mining title before the national mining authority
  • Formalized Mutual Benefit Agreement with the local ethnic authority
  • Agreement underway for exploitation over 150 ha

Interested in Project PM-26?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Tolima

Project AG-29

Active underground gold and silver operation, with concessions valid through 2070, regional government backing and strong local-employment social indicators.

Active exploitationTolimaGold & Silver
75,000 oz Au
10-yr est. production
100,000 oz Ag
10-yr est. production
2026–2070
Concession validity
35
Direct employees (up to 180 proj.)

1. Operation

  • Mechanized underground mining; processing plant under expansion
  • Process: drilling → blasting → haulage → milling → gravity separation → Au/Ag concentrate
  • Closed-loop water circuit; underground tailings deposit

2. Legal & social

  • 3 active concessions in good standing, backed by the regional governor’s office
  • 12 approved social management programs; public hearing held
  • Over 60% local labor and over 20% women

3. Investment

Projected revenue (16 yrs)USD 4,750 M
Projected social investmentUSD 2.5 M

Interested in Project AG-29?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Antioquia

Project AU-30

Gold property with approved production of 900 tonnes of ore per month, certified reserves and grades up to 40 g/t, undergoing legalization.

Legalization in processAntioquiaGold (Au)
19,406 oz
Certified reserves
USD 760k
Entry value
900 t/mo
Approved production
5–40 g/t
Variable grade

1. Geology & resources

Regional geologyRegional batholith
GradeVariable from 5 g/t to 40 g/t
StudiesOnly 5% of the title studied (channels and trenches) — 95% with upside potential

2. Legal status

  • Authorized operator; legalization in process
  • No legal annotations; obligations up to date
  • No public-order, Afro-descendant or Indigenous issues

Interested in Project AU-30?

Request the full executive investor summary and technical documentation.

Investor inquiries
Investment opportunity — Coquimbo, Chile

Gran Plata Project

District-scale high-sulphidation epithermal Ag-Au-Cu system in the Chilean Andes, drill-ready with permitting in place for an initial ~2,000 m program. Previously known as Salvadora.

Drill-ready explorationCoquimbo, ChileSilver — Ag / Cu / Au
US$4.0M
Option price (100%)
~400 g/t AgEq
Avg. surface grade
1,325 ha
Project area
39
Permitted drill pads

1. Geology & resources

Deposit typeHigh-sulphidation epithermal Ag-Au-Cu system; untested porphyry potential at depth
Regional geologyN-S vein/structure trend; mineralization traced >7.5-10 km along strike and >0.5 km vertically
Surface grade~400 g/t AgEq average (positive-value samples); highlight channel 9 m @ 407 g/t Ag, 2.94% Cu, 0.72 g/t Au
Resources / reservesNo JORC Mineral Resource or Ore Reserve declared — the project has not been drilled to date
Studies performed~200 historical channel/rock samples, airborne magnetics (2021), drill planning (2022), AEN sampling and due diligence completed Dec 2025

2. Legal status

  • 17 mining concessions; exploration and exploitation licences, 5-6 years remaining as of Q3 2026
  • Exclusive option to acquire 100%, agreement signed Sep 2025 — 3-year term with a possible 1-year extension
  • Two owner groups; due diligence completed Dec 2025
  • 39 drill pads permitted; most access roads already built

3. Investment terms

Purchase priceUS$4.0M for 100%
Royalty buyoutOptional US$2.0M to buy out a 1.0% NSR royalty
Planned programInitial ~2,000 m / 15 holes across 39 permitted pads
AccessOff a major highway — approx. 90 min from Vicuña, 2.5 h from La Serena

Reference information only; not an offer nor a statement of Mineral Resources or Ore Reserves under NI 43-101 / JORC frameworks. Based on a third-party technical data sheet (Source: Aeramentum Resources Ltd, Gran Plata presentation, Q3 2026) and subject to independent verification before any investment decision.

Interested in the Gran Plata Project?

Request the full executive investor summary and technical documentation.

Investor inquiries
How we advance

From prospect to investment

Prospect generation

Review of geological data, remote sensing and selection criteria to prioritize areas.

Basic exploration

Mapping, sampling and geochemistry to confirm the potential of each target.

Advanced exploration

Geophysics, drilling and modeling to size the deposit.

Resource definition

Resource estimation and a roadmap toward pre-feasibility studies.

Investment

Structuring the deal — acquisition, joint venture or strategic investment — to bring the project to development.

Ready to evaluate your next investment?

Let's talk about how Andean Resource Ventures can support your mining initiative from prospecting to resource definition, with the technical rigor and regulatory diligence institutional investors expect.

Contact us